Top 10 DMK Blowing machine factories

Before operation, it is necessary to lift the chemical barrel Blowing machine to a proper position to ensure that the head will not collide with the mold. DMK Blowing machine factory ranks the top 10.

The manufacturer of Weifang Yunlong Chemical Drum Blowing machine introduced that in order to meet the requirements of chemical products and environmental protection, it can normally reduce the damage to the chemical drum Blowing machine to a certain extent. So, it is also an important part to control the control mode of the whole chemical barrel Blowing machine.

Before making a decision, we need to consider controlling all auxiliary equipment such as hydraulic oil, lubricating oil, electronic circuit production line, etc. of each component of the chemical barrel Blowing machine. When you operate the chemical barrel blowing machine, you must follow certain procedures. (Note: everyone should ensure that the three templates can be installed safely.

PET Preform Making Machine

In short, personal accidental injury can be avoided before it is temporary. The manufacturer of the chemical barrel Blowing machine reminds everyone that when there is a failure of people or equipment, do not stop urgently or have reason to stop, and solve it in time. When the manufacturer of chemical barrel Blowing machine keeps pace with the times, the handle must be the most iron. Especially when the outlet pressure is fast, the smallest one can avoid excessive pressure and rapid cooling. In addition, in the chemical barrel Blowing machine industry, there is a very wide slide of about 16m. The slide and ball parts are suitable for parts of various industries, which can avoid traffic accidents and dangers.

Briefly introduce the maintenance of Blowing machine. The maintenance of Blowing machine is more important. If the equipment needs regular maintenance, what is maintenance? Let’s go together.

PET Jar Blowing Machine

● Before the start of each shift, all moving parts must be lubricated. (Manipulator, manipulator guide rail, mold opening and closing guide rail.

● The swing arm can be added once every (3-4) days. The large chain and small chain of the heater can be used once a month. Check whether the main engine reducer and heater reducer are short of oil. The main bearing can be added every 3 months.

● Before production, check whether the moving parts are firm, whether the screws are loose and fall off, especially in places with strong impact, and whether the belt drive part is abnormal.

● Check whether the heating head enters the embryo and whether the blastocyst works normally. If the insertion is not in place, the nut of the pressing device can be adjusted.

● When the solenoid valve of the AUTO bottle blowing machine is abnormal, it must be cleaned in time (once every 3.5 million bottles).

Scroll to Top